How Long Does It Take to Build a Custom Home in Atlanta?
Even as adults, when we're excited to get to the end of a long journey, we're compelled to ask, "Are we there yet?" Building a custom home is one of those journeys. It's exciting and can lead to a little impatience when we don't know where there is exactly. Well, we're here to lift the veil on your custom home-building timeline in the Atlanta area so you'll know just what to expect!
Each of these phases in the home-building process timeline plays a vital role in the successful completion of your home. By understanding how long it takes to build a house and what each stage involves, you can better manage your expectations and be actively involved in the construction of your new home.
How Long Does It Take to Build a Custom Home in atlanta?
It's very important to note that these are average timelines rather than a guarantee. As each custom home is unique, your timeline could be a bit different than these averages. However, a knowledgeable and trustworthy builder will always keep you in the know when it comes to your timeline. Let's begin!
Design (1-6 Months)
After your consultation, determining which professionals are the best fit, and finally choosing your custom home dream team, the next big step in the custom home building timeline is the design phase. Here, you'll sit down with your architect or designer to brainstorm and develop your blueprint for your future home. This stage includes everything from tacking down your floor plan to specifying every detail like fixtures and finishes.
How long does it take to design a custom home? It varies, but typically this phase can last anywhere from one to six months. This is a pretty wide window and depends on a few factors, like your availability, the decision-making process, and rounds of design revisions.
It's important not to rush this phase, as thorough planning here sets the tone for the entire home-building process. During this time, every aspect of the home, from energy efficiency features to smart home technology integrations, is considered and meticulously planned. Regular meetings with the design team ensure that your vision and the practical aspects of construction align perfectly. This proactive approach helps in identifying potential issues early, saving time and resources during the construction phase.
Pre-Construction (30-45 Days)
The pre-construction stage is where we lay the groundwork for your future home, beginning right after you've signed a retainer with your builder. Your builder and architect will collaborate to define the project's scope, budget, and construction agreement. This stage involves securing permits, gaining HOA approvals, and locking down your construction loan, all of which are crucial for keeping the project on track. Next up is gathering your team of trade partners to ensure every detail of your custom home will be taken care of with precision. It's not the most exciting part of the custom home process, but extremely necessary to set the groundwork for a successful project!
Site Excavation and Foundation (2-4 Weeks)
Site excavation and foundation is where you start building a house from the ground up. This phase kicks off the physical construction by preparing your land for the foundation, which is pivotal for the stability and longevity of your home. The process involves leveling the site, setting up proper drainage, and laying the foundation. Depending on the land condition and foundation type, this stage can take between two to four weeks.
Framing (6-8 Weeks)
The framing stage is where you really get to see your home take shape! How long does it take to frame a house? On average, it takes six to eight weeks. This is when your home’s structure is pieced together—walls go up, the roof is structured, and floor layouts are formed. This phase is critical as it outlines the shape of your building and involves substantial woodwork and framing.
Mechanical, Insulation, and Drywall (2-3 Weeks)
Moving into the guts of the building, the mechanical, insulation, and drywall phase covers the installation of plumbing, electrical systems, and HVAC—essential for making your house functional and comfortable. Once these systems are in place, the house is insulated and covered with drywall.
How long does drywalling a house take? It can take a week or more to install, mud, and sand the drywall, preparing it for finishing touches. Installing electrical, plumbing, and HVAC systems in addition to drywall will typically require two to three weeks. The timeline could be longer for larger houses.
Interior & Exterior Finishes (4 Weeks)
The interior & exterior finishes installation is where your choices made during the design phase come to life! It's often the most exciting phase for homeowners—you'll get to see the space and envision your life in your new space! Over approximately four weeks, interior elements such as cabinetry, countertops, and flooring are installed, along with exterior elements like siding and roofing.
Clean-Up (1 Week)
After the bulk of construction is completed, the clean-up phase ensures that your new home is pristine and ready for you to walk through with your project manager. You and your project manager will review every aspect and compile a punch list of any adjustments that need addressing. This is the final checkpoint in the residential construction timeline before you can move into your brand-new home!
Ready to Build Your Future Home with Elevation?
Building your custom home is an exciting process, and every step brings you closer to the keys of your dream house! Here at Elevation Building Company, we’re committed to guiding you through every phase with clarity and ease. If you’re curious about starting your own project or just have a few questions, give us a shout. We’re here to make sure your home-building experience is as smooth and enjoyable as possible, from your first meeting to the final touches.